FULL ROOF REPLACEMENT BUILT TO LAST

Complete strip, structural check and new roof - backed by a 10-year workmanship guarantee.

Full Roof Replacement

Full Roof Replacement

About This Service

When a roof is past the point of sensible repair, the right answer is a full replacement. We strip the roof back to the rafters, inspect the structure properly, and rebuild it using modern breathable felt, treated battens and your choice of concrete, clay or natural slate.

Every replacement is carried out by our own roofers - never subcontractors. The same team starts and finishes the job, which is why our standards stay consistent and our timescales hold up.

We project-manage the whole thing including skip hire, daily site clean and final waste removal. You get a 10-year workmanship guarantee in writing when we're done.

What's Included

EVERY JOB COVERS

  • Full strip-back of existing roof covering to the rafters
  • Structural inspection of rafters, purlins and timbers
  • New breathable membrane (felt) across the full roof
  • New treated softwood battens to current spec
  • Your choice of concrete, clay or natural slate tiles
  • New ridge tiles, hip tiles and valley treatment
  • All new lead flashings to chimneys and abutments
  • Repair or replacement of any rotten timbers found
  • Skip hire, scaffolding and all site clearance included
  • Daily clean-down so your home stays usable
  • 10-year workmanship guarantee in writing

How We Work

THREE STEPS. NO SURPRISES.

01

SURVEY & DETAILED QUOTE

We measure up, agree your tile choice, and produce a fixed-price quote covering every part of the job - materials, labour, skip, scaffolding.

02

STRIP & STRUCTURAL CHECK

We strip the roof, inspect every timber, and tell you before we cover anything back up if we find anything that needs attention.

03

REBUILD & SIGN-OFF

Felt, battens, tiles, ridges and flashings all installed, the site fully cleared, and a final walk-round before we hand over.

Why Choose Us

WHY HOMEOWNERS PICK A CLASS

OUR OWN TEAM

No subcontractors. The same roofers start and finish your job - you'll know everyone on your scaffold.

10-YEAR GUARANTEE

Written workmanship guarantee on every full replacement, backed by us as the company that did the work.

FULL PROJECT MANAGEMENT

Skip, scaffolding, materials and clean-up - all handled for you. One point of contact from start to finish.

Warning Signs

SIGNS YOU NEED THIS

Spotted any of these? Book a free inspection - better to know now than after the next storm.

1

Roof is over 30 years old and has never been replaced

2

Repeated repairs that keep failing in different spots

3

Visible sagging or dipping along the roofline

4

Widespread cracked, flaking or porous tiles

5

Persistent leaks that return after every spell of bad weather

6

Daylight showing through the felt in the loft

The Job Itself

WHAT THE WORK ACTUALLY INVOLVES

  1. 01

    Survey and structural check

    Before we quote we get in the loft and up on the roof, and we photograph what we find so you can see the state of it yourself rather than take our word for it. We are looking at rafter sizes, spread at the wall plate, purlin sag, woodworm, and whether previous owners have cut through anything for a loft conversion. That is what decides whether you need a straight re-roof or timber work as well - and it all goes into a full written cost breakdown before any work starts.

  2. 02

    Scaffold and strip

    Scaffold goes up with a proper edge protection lift and a rubbish chute. The roof is stripped in sections, never all at once, so the house is never open to the sky overnight. Old tiles, battens and felt go straight into the skip; sound slate is set aside if you want it reused.

  3. 03

    Timber, felt and battens

    Any rotten rafter feet or wall plate is cut out and spliced before anything goes back on. Then breathable membrane, taped and dressed into the gutter, and new treated battens gauged to the tile you have chosen. This is the layer that decides whether your roof lasts 20 years or 60.

  4. 04

    Tiling, lead and detailing

    Tiles or slate go on from the eaves up, with mechanically fixed dry ridge and dry verge as standard rather than mortar. Chimneys get new code 4 or code 5 lead soakers and stepped flashing. Valleys are re-lined. Eaves get comb filler and a proper drip.

  5. 05

    Clean, inspect, hand over

    Gutters are cleared of debris, the garden is magnet-swept for nails, scaffold comes down, and we walk the roof with you from the ground with photos of the parts you cannot see. The 10-year workmanship guarantee is issued in writing with the final invoice.

Verified Work

JOBS WE'VE ACTUALLY DONE

Real jobs, described by the customers themselves.

FULL ROOF REPLACEMENT, ROWLANDS GILL

Verified Facebook recommendation · Rowlands Gill, Gateshead - NE39 · July

  • Completed in six days from scaffolding going up to scaffolding coming down - a typical timescale on a house roof, not a guarantee. Bigger or steeper roofs, natural slate, rotten timbers found at strip stage and lost weather days all add time.
  • The job was brought forward and started earlier than originally scheduled.
  • Our roofers went up on the roof and photographed the problems so the customer could see exactly what needed doing before committing.
  • A loose tile overhanging an alleyway was taken down on the spot as a safety issue.
  • The customer was talked through the different tile and ridge options before anything was ordered.
  • We advised removing a redundant chimney rather than repairing it, because repairing something no longer in use is money spent twice.
  • We came back after completion to inspect the finished roof with the customer before sign-off.

FULL ROOF REPLACEMENT, WIDEOPEN

Verified Facebook recommendation · Wideopen, Newcastle - NE13 · August

  • The customer had several quotes and chose us on the strength of the inspection and the written price.
  • Pointing was carried out on both the house and the roof as part of the same job.
  • The skip was collected the day after it was full rather than left sitting outside.
  • Scaffolding was taken down and removed as soon as the job finished.

Honest Pricing

WHAT IT'S LIKELY TO COST

A full replacement is priced on roof size, tile choice and scaffold access - not on the day. Concrete tiles are the most affordable option, with clay and natural slate costing more. Every quote is a fixed written price including scaffolding, skip and clean-up. If we find rotten timbers when we strip the roof, we tell you the cost before doing the work.

A standard three-bed semi in Tyne and Wear is typically £6,500 to £9,500 including scaffold and skips. Terraced houses often come in lower; detached properties, natural slate and complex roof shapes push higher.

WHAT MOVES THE PRICE

  • Roof area and shape - hips, dormers and valleys all add labour
  • Tile choice: concrete interlocking is the cheapest, plain clay and natural Welsh slate the dearest
  • How much timber needs replacing, which is only fully known once the roof is stripped
  • Scaffold complexity - conservatories, back lanes and highway licences all add cost
  • Chimneys: each one needs new lead and usually repointing at the same time
  • Whether you want insulation upgraded while the roof is open

NOT INCLUDED

  • Chimney stack rebuilds or removal above roof level
  • Loft insulation upgrades unless specified on your quote
  • Internal redecoration, including hairline cracks from scaffold vibration
  • Solar panel removal and refit, which the panel installer must do
  • Planning or conservation applications, though we will tell you if you need one

Timescales

HOW LONG IT TAKES - AND IF THE WEATHER TURNS

  • Most semi-detached re-roofs take 4 to 7 working days once scaffold is up.
  • Larger detached and natural slate jobs run 8 to 14 days.
  • We never strip more than we can make watertight the same day, so an unexpected downpour costs you nothing.
  • Sustained heavy rain or winds above 40mph stop tiling for safety. We sheet the roof, stand down, and pick the job back up - the fixed price does not change because the weather did.