
DRY RIDGE SYSTEM INSTALLATION
Mechanical dry ridge replacing traditional mortar - long lasting, ventilated and maintenance free.

Dry Ridge
About This Service
Traditional mortar-bedded ridges fail. They crack, crumble, lift in high winds and need repointing every 10 to 15 years. A modern dry ridge system fixes the problem permanently.
Dry ridge replaces the mortar with mechanical clamps and weatherproof unions that fix ridge tiles directly to the roof timbers. The result is a stronger, longer-lasting ridge that also ventilates the roof space underneath.
We install dry ridge to current British Standards across the full North East, backed by a manufacturer warranty on the system plus our written workmanship guarantee.
What's Included
EVERY JOB COVERS
- Removal of existing mortar ridge bedding
- Strip and inspection of every ridge tile
- New dry ridge battens and brackets installed
- Mechanical fixings into roof timbers
- Weatherproof union strip between every tile
- Reuse of existing tiles where sound, new where cracked
- Improved roof ventilation built in as standard
- Full clean-down and waste removal
- Manufacturer warranty on the dry ridge system
- Our written workmanship guarantee on top
How We Work
THREE STEPS. NO SURPRISES.
INSPECT & QUOTE
Free roof inspection, fixed written quote covering the full dry ridge install - no surprise costs.
STRIP & PREPARE
Existing mortar removed cleanly, every ridge tile inspected, new battens fitted ready for mechanical fixing.
INSTALL & SEAL
Dry ridge units clamped down, union strips sealed between tiles, final walk-round before sign-off.
Why Choose Us
WHY HOMEOWNERS PICK A CLASS
BUILT TO BS 5534
Installed to the British Standard for mechanical roof fixings - the same spec used on new-builds.
NO MORE REPOINTING
No mortar to crack or fail. Once it's done, you're not paying for repointing every decade.
BETTER VENTILATION
Dry ridge ventilates the roof space, reducing condensation and protecting timbers.
Warning Signs
SIGNS YOU NEED THIS
Spotted any of these? Book a free inspection - better to know now than after the next storm.
Mortar-bedded ridges cracked or crumbling
Ridge tiles lifted or moved in high winds
Repeated repointing that keeps failing
Condensation or damp in the loft
Old roof being re-covered and needing a permanent ridge solution
Insurance request for a compliant ridge fixing
The Job Itself
WHAT THE WORK ACTUALLY INVOLVES
- 01
Strip the old ridge
Existing ridge tiles are lifted and the old bedding mortar chipped off the tile edges beneath. Sound ridge tiles are reused where you want to keep the original look; cracked ones are replaced to match.
- 02
Fit the ridge roll and batten
A ventilated ridge roll is dressed over the apex and down onto the top course either side. It seals against wind-driven rain and insects while still letting the loft breathe - a mortared ridge does neither.
- 03
Mechanically fix every tile
Each ridge tile is screwed through a unifix clip into the ridge batten. Nothing relies on adhesion, so nothing fails when the mortar would have shrunk. Union pieces and end caps finish the run.
- 04
Check the whole apex line
While we are up there we check the top course of tiles, the hip ends and the abutments, because a failed ridge has usually let water sit somewhere it should not have.
Honest Pricing
WHAT IT'S LIKELY TO COST
Dry ridge is priced by linear metre and complexity of the roof. Most semi-detached and terraced houses fall within a clear price band; bungalows are cheaper, large detached and unusual rooflines cost more. Every quote is a fixed written price including disposal of the old mortar.
A standard semi with roughly 8 to 10 metres of ridge is typically £550 to £950. Adding hips or a longer detached run usually brings it to £1,000 to £1,800.
WHAT MOVES THE PRICE
- Metres of ridge and whether hips are converted at the same time
- Whether existing ridge tiles can be reused or new ones must be sourced to match
- System choice - Manthorpe, Klober and Marley kits vary in price and appearance
- Access and roof pitch; steep and three-storey roofs need more equipment
- Whether the top course of tiles has also been disturbed and needs re-fixing
NOT INCLUDED
- Full re-roofing or battening below the top course
- Chimney and abutment flashing work
- Verge conversion, which is priced as dry verge
- Scaffold where the pitch or height requires it
Timescales
HOW LONG IT TAKES - AND IF THE WEATHER TURNS
- Most dry ridge conversions are a single day.
- Ridge plus both hips is usually one and a half to two days.
- Dry ridge has a real advantage here: because nothing needs to cure, we can fit it in cold weather that would stop repointing. We still stop for high winds - handling ridge tiles at the apex in a gale is not sensible.
FAQ
QUESTIONS ABOUT DRY RIDGE
READY FOR A FREE INSPECTION?
No call-out fee, no pressure, no upselling. Just an honest look at your roof and a written quote if you need any work.
Related Work
OFTEN DONE AT THE SAME TIME

Dry Verge
Clip-on gable caps that stop mortar cracking and dropping off the verge.
DRY VERGE CAPS FOR GABLE ENDS
Pointing
Ridge, verge and chimney mortar cut out and renewed with the correct mix.
ROOF AND CHIMNEY REPOINTING
Full Roof Replacement
Full strip, structural check and a new roof, guaranteed in writing for 10 years.
FULL ROOF REPLACEMENT IN NEWCASTLE AND COUNTY DURHAM